Crestbrook Drive Water Line Performed design and construction administration services for approximately 3,200 LF of 6" water line for the Willowbrook Water & Sanitation District. The project took place in the Willowbrook Subdivision in Morrison, CO. The work included 5 fire hydrants and View Project
Special District / Infrastructure Projects
The project experience presented herein combines key civil engineering projects worked on by our two owners over the past decade. Involvement includes the planning, design, management and oversight.
Meadowbrook Water District
South Estes Street Water Line Performed design and construction administration services for approximately 2,700 LF of 8" & 12" water lines for the Meadowbrook Water District. Construction Completed in 2015 Villager Square Fusible Water Line Performed design and construction View Project
Granby/SilverCreek Water and Wastewater Authority
Village Road Water & Sewer Lines, Granby Performed design, bidding and construction administration services for approximately 5,000 LF of new 16” water line and 3,800 LF of new 15" sanitary sewer line for the Granby / SilverCreek Water and Wastewater Authority. Construction Completed in View Project
Grant Water and Sanitation District
2012 Benton Circle Underdrain Replacement Project Performed design, bidding and construction administration for the replacement of 970 LF of 6-inch underdrain mainline, and the addition of two new manholes. Construction Completed in 2012 2011 Capital Improvements – Sewer Rehabilitation View Project
Granby Ranch Infrastructure
Zone Two WST and Water Transmission Main, Granby Performed the site design of a new 750,000 gallon water storage tank and pipeline design for 3,500 LF of 12" water main to serve over 1,000 residential units on the east mountain of the SolVista Basin Ski Area in Granby. Construction Completed View Project
Fairways Sewer Lift Station, Granby Ranch
Performed design and CDPHE Site Approval the Fairways Lift Station sized to serve 87 residential units in the vicinity of the SolVista Basin Ski Area in Granby. The Project consisted of the design of a lift station, 5,100 LF of 8" and 15" sewer main, and 2,000 LF of 4" force main. Construction View Project
Dream Weaver Homes
Echo Lake Drive and Nuthatch Road Improvement Project – Evergreen, CO Project included roadway widening and asphalt placement, drainage improvements, erosion and sediment control, and retaining wall installation in Echo Lake Drive and Nuthatch Road in Evergreen. The project consisted of 3,000 View Project